When should I expect to see CMMC in contracts?

The CMMC is currently in the "pilot" phase and is being rolled out over a five year period that began in November 2020. Each year the number of contracts that the DoD is incorporating CMMC requirements into will increase until full rollout in 2025. After 2025, all DoD contracts will have, at a minimum, a CMMC Level 1 certification requirement.

Type of FAQ
Export Control